Facebook Pixel Code
x
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Waste Management in Cumbria Essay Example

Show related essays

Waste Management in Cumbria

It was as a result of the ban that the Distington was preferred as a point for treating aqueous non-hazardous wastes that were sent initially to the landfill (Messenger 2014). A Liquid Waste Acceptance Facility was built near to the existing leachate treatment plant so as to provide treatment services continuously to the liquid waste disposal to the customers. It was believed that the construction of the plant would also result to the generation of income through creation of new business.The introduction of third party wastes was associated with the occurrence of detrimental effects to bacterial biomass. Unfortunately, the loss of bacterial biomass was also thought to result to the failure of the sewers, financial penalties, as well as prosecution. Additionally, the loss of the bacterial biomass was thought to increase the disposal costs. It was as a result of these reasons that the CWM decided to introduce a Strathtox respirometer to identify the content of the incoming liquid wastes in order to avoid compromising the health of biomass (Cumbria Waste Management 2014). The instrument is extensively used in monitoring and screening all liquid products that are treated in the LWTF (Messenger 2014). For instance, it is evident that liquids exhibiting an EC50 value of 20% and below are considered unsafe for treatment and are sent back. In other words, majority of the waste products handled by the Cumbria Waste Management Limited are relatively harmless to the living biomass, and they usually provide the desired inhibitory results. The Strathtox equipment enables the company to do away with any uncertainty regarding the biomass.Derwent Recycling Services Ltd is also a recycling waste management company that is located in Workington, Cumbria. The company provides a complete waste disposal as well as recycling services in the whole of Cumbria (Wainwright 2013). The waste management by the company covers metal recycling services, wood recycling services, glass recycling services, paper and cardboard recycling, plastic recycling services, and industrial and commercial waste collection.In recycling the metals, the company provides an extreme service that result to the separation of ferrous metals from non-ferrous metals. In addition to providing people with containers in which they put their used metal containers, Derwent Recycling Services Ltd also schedule one-off collections to meet the demands of the people. Derwent Recycling

Reference

List

Borough Recycling hits the charts, 2013, viewed 20 November 2014, <http://www.barrowbc.gov.uk/Default.aspx?page=4549&passid=10081>

Chapman, I 2012, ‘Cumbria Waste Management Ltd – Use of the Strathkelvin Strathtox Respirometer in Waste Acceptance Testing,’ viewed 20 November 2014, <http://www.strathkelvin.com/documents/cumbria-waste-management-strathtox-respirometry.pdf>

Cumbria County Council 2014, http://www.cumbria.gov.uk/landing_page/wasteandrecycling.asp

Cumbria County Council and Shanks Waste Management case study, 2011. Health and Safety Executive, viewed 20 November 2014, http://news.hse.gov.uk/2011/01/04/cumbria-county-council-and-shanks-waste-management-case-study/

Cumbria Waste Management 2014, viewed 20 November 2014, http://www.cumbriawaste.co.uk/cgi-bin/v4/frm3ml.pl

Cumbrian Partnership Increases Recycling 2014, viewed 20 November 2014 http://www.itv.com/news/border/update/2014-09-03/cumbrian-partnership-increases-recycling/

Derwent Recycling Services Ltd 2014. http://www.derwentrecyclingservices.co.uk/

Messenger, B, 2014, ‘New Recycling & RDF Facility Hits 98% Landfill Diversion in Cumbria, Waste Management World,’ viewed 20 November 2014, <http://www.waste management-world.com/articles/2014/10/new-recycling-rdf-facility-hits-98-landfill-diversion-in-cumbria.html>

Recycling Collections 2014, Cumbria Waste Group, viewed 20 November 2014, <http://www.cumbriawaste.co.uk/item/recycling-collections>

Resource Cumbria 2008, Cumbria Strategic Waste Partnership, viewed 20 November 2014, <http://www.recycleforcumbria.org/eLibrary/Content/Internet/534/39636112827.pdf> Wainwright, M 2013, ‘Cumbria Rejects Underground Nuclear Storage Dump, the Guardian,’ viewed 20 November 2014, <http://www.theguardian.com/environment/2013/jan/30/cumbria-rejects-underground- nuclear-storage>

Resource Cumbria 2013, Cumbria Strategic Waste Partnership: Joint Municipal Waste Management Strategy 2008-2020, viewed 20 November 2014, <http://www.cumbria.gov.uk/elibrary/content/internet/534/39339153747.pdf>

Rothay Holme, Ambleside 2014, Recycle for Cumbria, viewed 20 November 2014, <http://www.recycleforcumbria.org/recycling/household-recycling/rothay-holme.asp>

Technical Due Diligence of Cumbria’s Waste Management Facilities 2002, viewed 20 November 2014, <http://amec-ukenvironment.com/downloads/pp_1222a.pdf>

Waste Management Cumbria County Council 2004, viewed 20 November 2014, <http://archive.auditcommission.gov.uk/auditcommission/sitecollectiondocuments/InspectionOutput/InspectionReports/2004/CumbriaCCWaste%20management02-sep-04rep.pdf>

Close ✕
Tracy Smith Editor&Proofreader
Expert in: Environmental Studies, Physics, Formal science & Physical science
Hire an Editor
Matt Hamilton Writer
Expert in: Environmental Studies, Geography, Logic & Programming
Hire a Writer
preview essay on Waste Management in Cumbria
  • Pages: 10 (2500 words)
  • Document Type: Essay
  • Subject: Environmental Studies
  • Level: Ph.D.
WE CAN HELP TO FIND AN ESSAYDidn't find an essay?

Please type your essay title, choose your document type, enter your email and we send you essay samples